Supply, demand and exchange.
The disassembly of MSN 3045 (Ex-Volaris, manufactured in 2007) has started at the end May. The aircraft is equipped with V2500 nacelles and a Honeywell GTCP-131-9A APU.
With this project, we maintain a steady flow in the supply chain of A320
materials available from our warehouses. Combined with our previous projects, we can offer a wide range of various items which will extend our product range even further. For example the avionics, different types of nacelles and the landing gear.
The aircraft is also equipped with an IGS nitrogen pallet, like most A320 family aircraft in the Americas.
The majority of the parts will be shipped to our warehouses in Miami and Amsterdam from where we shall serve both the USA and the EMEA market.